Skip to main navigation

Business Hours: 7 a.m - 4 p.m MON - FRI
Call Us (909) 947-2980

This was one of JLMC, Inc.’s largest projects. We had two months to complete this entire project, and we worked 24 hours a day in order to finish. We worked side by side with our customer in order to complete it on schedule. An assembly line was set up on our three-acre lot. The first station consisted of welding the framework together. From there, the panels were put onto a conveyor and moved down the line. On the conveyor we attached the skins and the hat section. Then came the paint and decals. By the time the panels got to the end of the line, we lifted them into our transporting fixtures, and they were loaded on the trucks. It took 53 diesel trucks to deliver this to the Space Center in Huntsville, Alabama. We also got to meet the astronauts from the first Apollo mission: Alan Bean, Dick Gordon, and Pete Conrad. It was very cool. It is a must see if you are ever in Huntsville, Alabama. Click on the pictures for a closer view.

If you have a project like this, please contact JLMC, Inc gel viagra., and we will have one of our sales representatives contact you within 24 hours. Call us at 909-947-2980 or fill out our online contact form for more information.

design-updatedLocated in an art gallery in in San Diego, these cubes are made of #8 (Mirror Finish) stainless steel and finely polished. The bottom corner is “sheared-off,” and there is a counter balance weight inside that makes them stand on the edge. These are absolutely beautiful. We have one in our showcase area because we liked them so much. Contact us to come and see some of the other custom designs we have created.

If you have a project like this, please contact JLMC, Inc., and we will have one of our sales representatives contact you within 24 hours. Call us at 909-947-2980 or fill out our online contact form for more information.

F-18 Fighter JetJust about everything Team JLMC Inc. does is custom fabrication. This is a full scale F-18 fighter jet all 11 & 12 galvanized stainless steel construction. This was a Solid Works project from our customer and the second fighter jet that we have done. From start to finish, this project took us two months to complete.

If you have a project like this, please contact JLMC, Inc., and we will have one of our sales representatives contact you within 24 hours. Call us at 909-947-2980 or fill out our online contact form for more information.

duck-updatedThe world’s largest floating Rubber Duck floats on the frame JLMC, Inc. built. Yes, we did that!!! Have you heard of the World’s Largest Rubber Duck? Fascinating and creative fun, and JLMC, Inc. was there.

The floatation device was a 50-foot diameter round pontoon made of 24” schedule 10 pipe welded in sealed sections that bolted together for onsite assembly. Also included was a frame structure for supporting a plywood deck under the duck.

The duck itself is an air bag similar to a kid’s jumper and is really the world’s largest rubber ducky!Roblox Free Unlimited Robux and Tix

Click here to read more about the world’s largest floating Rubber Duck.

If you have a project like this, please contact JLMC, Inc., and we will have one of our sales representatives contact you within 24 hours. Call us at 909-947-2980 or fill out our online contact form for more information.